Skip to content
NTWHS and safetyVerified 23 July 2026

WHS Incident Reporting Requirements in the Northern Territory

Section 38 WHS Act 2011 (NT) requires PCBUs to notify NT WorkSafe immediately. The reg 292 construction project trigger sits at $1 million from 28 May 2026.

What it is

Section 38 of the Work Health and Safety (National Uniform Legislation) Act 2011 (NT) requires a PCBU to notify NT WorkSafe immediately after becoming aware of a notifiable incident. NT WorkSafe operates a 24-hour incident line.

The framework follows the model WHS Act as adopted across NSW, QLD, WA, SA, TAS and ACT. The NT small market means relatively few prosecutions but the same statutory framework applies.

What must be notified

Section 35 defines notifiable incident as death, serious injury or illness (section 36), or dangerous incident (section 37). NT definitions match the model WHS Act.

Immediate notification and site preservation

Section 38(1) requires notification immediately after the PCBU becomes aware. Section 39 requires site preservation until the inspector arrives or authorises otherwise, subject to standard exceptions.

Written notice conditional

Section 38(4)(b) requires written notice only if the regulator requests it. That is the model WHS Act position.

Record-keeping

Section 38(5) and the WHS Regulations 2011 (NT) require record retention for at least 5 years.

Penalties

Section 38 offence carries penalties up to $10,000 for an individual and $50,000 for a body corporate as a strict liability offence.

Interaction with section 34B industrial manslaughter

Section 34B industrial manslaughter (from 2020) applies to workplace deaths in the NT. Notification failures can be treated as an aggravating factor. The NT's life imprisonment maximum for individuals under section 34B is distinctive in Australia.

Reg 292 construction project trigger at $1 million

WHS Regulations 2011 (NT) reg 292 sets the construction project value trigger at $1 million, amended on 28 May 2026 by SL No. 14 of 2026 (up from $500,000 in the previous framework). That is the highest construction project value threshold in Australia.

The NT WorkSafe bulletin still cites the previous $500,000 figure and is stale on the current $1 million threshold. TradeForm NT templates use the correct $1 million figure post-28 May 2026.

Interaction with Building Practitioners Board

WHS Act notification failures by an NT registered building practitioner can trigger Building Practitioners Board disciplinary action alongside NT WorkSafe enforcement. The Commissioner for Residential Building Disputes has separate jurisdiction over building work disputes but coordinates with NT WorkSafe on safety-related workmanship failures.

How the Northern Territory compares

The NT's section 38 framework aligns with NSW, QLD, WA, SA, TAS and ACT under the model WHS Act. The distinctive NT features are:

  • reg 292 construction project trigger at $1 million (highest in Australia)
  • section 34B industrial manslaughter with life imprisonment maximum for individuals (unique in Australia)
  • interaction with the Building Practitioners Board and Fidelity Fund NT framework

Citations

  1. [1]

    Work Health and Safety (National Uniform Legislation) Act 2011 (NT), sections 34B, 35-39 and Regulations reg 292

    legislationNorthern Territory Government · NT · accessed 23/07/2026

    Section 34B industrial manslaughter (life imprisonment individual, $15.5m body corporate). Sections 35-39 notifiable incident framework. Regulations reg 292 construction project trigger $1m from 28 May 2026.

  2. [2]

    Building Act 1993 (NT)

    legislationNorthern Territory Government · NT · accessed 23/07/2026

    Building Act 1993 (NT) Building Practitioners Board and Commissioner for Residential Building Disputes framework interacting with WHS Act 2011 (NT) enforcement.

  3. [3]

    NT WorkSafe notification

    governmentNT WorkSafe · NT · accessed 23/07/2026

    NT WorkSafe guidance on notification process. Note: NT WorkSafe bulletin still cites the previous $500,000 construction project threshold and is stale on the current $1 million figure from 28 May 2026.


How this was researched

This entry was drafted from primary Australian sources (legislation, regulator publications and industry guidance) and reviewed and signed off by Hunter Jacobs, Director, TradeForm. Citations link to the source documents you can verify yourself. The entry is re-verified on a cadence and automatically flagged for review when a watched source changes.

Disclaimer

This is general information about Australian construction and business topics. It is not legal, engineering, or financial advice. Laws and standards change. Verify current requirements with a licensed professional in your jurisdiction before relying on this content.